12-16 Catalano Road
Canning Vale,
Western Australia 6155

PO Box 1653,
Canning Vale,
Western Australia 6970

Telephone: 08 9256 0900
Facsimile:  08 9456 0388

E-mail: info@barclayeng.com.au
Web: www.barclayeng.com.au


Ausdrill West Africa Power Station

Ausdrill International and Management

Year: 2017-2018

With Barclay Engineering’s experience and capabilities, we had participated in design and fabricating on 11 off enclosure and 1 switch-room for West Africa Power Station.

The switch-room was design and fabricated at Barclay Engineering with our in-house electrical services.

 

Tesla Picton Peak Lopping Power Station

Energy Power Systems (Aust)

Year: 2011-2012

Design,manufacture and installation of 5 off Acoustic Enclosures for Caterpillar 3516B, complete with all mechanical systems.

 

 

German Creek Power Station

Energy Development Ltd

Year: 2005-2006

Barclay Engineering was given the opportunity in engineering, design, manufacture and install 16 genset modules enclosure for German Creek Power Station.